Hydro Green Energy, LLC

You need to upgrade your Flash Player This is replaced by the Flash content. Place your alternate content here and users without the Flash plugin or with Javascript turned off will see this. Content here allows you to leave out noscript tags. Include a link to bypass the detection if you wish.

Environmental

» Definitions
» Applications
» Benefits
» Technology Comparison
» Environmental
» Resource Assessments

In-Stream Hydrokinetic, Tidal Energy and Ocean Energy Environmental & Permitting Issues

Hydro Green Energy’s river (in-stream and Hydro+™), ocean and tidal power projects are environmentally friendly, clean and renewable. Below are some of the attributes of Hydro Green Energy’s many hydrokinetic power projects:

• Zero carbon emissions
• Zero air pollution (NOx, SO2, mercury)
• Zero noise pollution
• Minimal visual impacts
• Minimal impact and interaction with seabed and riverbed
• Easily identifiable turbine arrays for boating, navigation and fishing interests
• Low solidity ratio rotor
• Large diameter rotor
• Very slow turbine blade rotation – 21 RPM
• Low number of turbine blades – three
• Very small pressure gradients
• Modeling shows a fish survival rate of 99%

Permitting
Our patented technology at Hydro+™ projects today qualifies for the Section 45 incremental hydropower production tax credit (1 cent per kWh) in the United States. These projects are brought on-line via an amendment to the existing hydropower project license.

For in-stream, tidal and ocean projects, Hydro Green Energy will obtain a preliminary permit, utilize the Federal Energy Regulatory Commission’s (FERC) hydrokinetic pilot license process for a small-scale demonstration, and then proceed to a traditional license for the full-scale project.

The hydrokinetic pilot license process (United States) allows:
• Receive pilot license within 6 months of filing application;
• Pilot license good for up to 5 years;
• Pilot license allows generation up to 5 MW;
• Pilot license allows electricity to be sold on the electric power grid (earn revenue while building out full-scale project);
• Pilot license can be converted into permanent 30 to 50 year license; and
• Units must be removable if no permanent license application will be filed or if unexpected issues arise during testing and demonstration phase.





Valid HTML 4.01 Transitional Valid CSS!

Copyright © 2002 - 2008 Hydro Green Energy, LLC | Site Map | Links
5090 Richmond Avenue, #390 Houston , TX 77056